MANUFACTURING SOURCE BY EQUIPMENT SCOPE

Manufacturing & Equipment Supply Capabilities

Grace’s family-owned factory and the specialist partner route are stated separately so customers know who produces each equipment package.

01

GRACE’S FAMILY-OWNED FACTORY

Stainless Steel & Carbon Steel Manufacturing by Grace’s Family Factory

Grace’s family owns and operates the manufacturing facility in Yixing. The factory produces project-specific stainless steel and carbon steel equipment and fabricated components.

Project-specific equipment, frames, skids, tanks, housings and fabricated components can be reviewed against customer drawings and specifications.

The capability summary below is based on company profile materials from Grace’s family-owned factory and additional scope confirmed by Grace.

Grace’s family factory directly manufactures the confirmed stainless steel, carbon steel, biological odor control and activated carbon equipment. Selected specialist manufacturers are used only for categories outside the confirmed scope of the family-owned factory.

Before quotation, the responsible factory confirms materials, dimensions, process requirements, documentation, inspection scope and production limitations for the project.

FAMILY FACILITY FOOTAGE

See the stainless steel fabrication workshop

Authorized workshop footage supplied by Grace. The video documents the family manufacturing facility and stainless steel fabrication environment; it does not by itself represent certification, production capacity or an unlimited product range.

Family-owned stainless steel manufacturing facility in Yixing · footage used with permission
01

Drawing-Based Cutting & Forming

Factory-provided materials describe drawing-based cutting, forming and CNC bending. The applicable process, plate specification and dimensional limits are confirmed against the approved project drawings.

02

Carbon Steel & Stainless Steel Welding

Factory-provided materials describe gas-shielded welding for carbon steel work, submerged arc welding where suitable, and argon arc welding for critical stainless steel welds. Procedures, qualifications and acceptance criteria remain project-specific.

03

Project-Specific Surface Protection

For carbon steel equipment, surface preparation and coating or lining systems are selected according to the medium, temperature and installation environment. The final system and inspection records are defined in the project documents.

04

Assembly & Factory Checks

Dimensional checks, interface positions, assembly condition and equipment-specific testing can be included according to the agreed inspection plan and contract scope.

05

Quality & Export Documentation

Material certificates, purchased-component certificates, inspection records, agreed test reports, coating records, packing lists and export documents can be coordinated when specified in the contract.

06

Biological Odor Control Units

Biological odor control equipment is manufactured directly by Grace’s family-owned factory. The process design, materials, configuration, dimensions and performance requirements are confirmed against the written project scope before quotation.

07

Activated Carbon Adsorption Equipment

Activated carbon adsorption equipment is manufactured directly by Grace’s family-owned factory. Vessel material, carbon media, airflow, interfaces, monitoring requirements and included scope are confirmed project by project.

02

SELECTED SPECIALIST MANUFACTURERS

Equipment Supplied by Specialist Manufacturing Partners

These categories are supplied through selected specialist manufacturing partners when they fall outside the confirmed scope of the family-owned factory.

01

FRP and PP odor control equipment

Supplied through selected specialist manufacturing partners.

02

Wastewater pretreatment equipment

Supplied through selected specialist manufacturing partners.

03

Membrane and filtration systems

Supplied through selected specialist manufacturing partners.

04

Sludge handling equipment

Supplied through selected specialist manufacturing partners.

05

Packaged environmental equipment units

Supplied through selected specialist manufacturing partners.

03

WRITTEN REVIEW FIRST

What is confirmed before quotation

Actual manufacturing sourceIncluded and excluded scopeMaterials and drawingsInterface pointsInspection documentsPacking and shipment requirementsPrice and payment basisProject-specific lead time

Technical meetings are scheduled with the relevant manufacturing or process engineer after the initial project scope has been reviewed in writing.

START WITH YOUR PROJECT REQUIREMENTS

Share the scope before scheduling the technical step.

For an initial written review, share the application, capacity or airflow, key contaminants, required equipment scope, preferred materials, available drawings, destination and target schedule.